Project Overview
- Location: Parachute, Colorado
- Owner: EPCO Holdings, Inc.
- Engineer(s): Alliance Wood Group Engineering, L.P.
- Contract Type: Negotiated
- Status: Completed
When it comes to natural gas delivery, everyone is in a hurry, owners and consumers alike. At the JackRabbit Phase II Project near Parachute, Colorado, EPCO faced landowner and environmental restrictions on top of the significant challenge of finding a contractor capable of constructing a sophisticated high-pressure natural gas pipeline across terrain that routinely receives anywhere from 4 to 8 feet of snow annually.
Barnard met the challenge. We hired crews totaling 250 employees to work on a fast-track schedule to build roughly 2 miles of 20-inch steel suction line; roughly 10 miles total of 10-inch pipe in three separate lateral lines; seven launcher/receiver sites; three creek crossings; and multiple road crossings. Despite the difficult access and myriad restrictions, we completed the work on time and on budget to the owner’s satisfaction.
Zach Bowler
p: (406) 586-1995 x283
e: zach.bowler@barnard-inc.com
© BARNARD | Privacy Statement | Terms of Use | Employee Login